Commercial solar · Office

The Gallagher Group: on the road to net zero

86kWsolar PV system
27%average annual return

Overview

Looking to cut the carbon footprint of their main office as part of their journey to net zero, the Gallagher Group asked us to design and install a rooftop solar system.

Work carried out

Design and installation of an 86kW solar PV system on the main office

The result

Big savings on energy bills, an average 27% return on the investment and a lower carbon footprint. We look forward to working with them for years to come.

Gallagher Group logo

Planning something similar?

Tell us about your home or business and we’ll show you what’s possible, with honest figures and no obligation.

More of our work

Other projects

Solar panels across the Stevens & Carlotti factory roof in Richborough
656kW · 19% return
Four systems and counting, covering the whole Richborough site.
Bank of commercial batteries and inverters installed at Roe Stairs
630kW + 100kW battery
Two sites, with one of the largest battery installations we’ve fitted.
Sub-Zero and Wolf showroom in Knightsbridge with feature lighting
Showroom rewire & lighting
Rewiring, feature lighting and appliance installations for a stunning two-floor showroom with a theatre kitchen, wine room and curved networking space.

Your project next?

Let’s write your case study

Home or business, it starts with a free survey and an honest conversation about what solar, storage or electrical work could do for you.